What We Do

Services

Every deck job we quote falls into one of these, though most projects mix two or three of them.

HomeServices

Everything we take on

Every job below is one we do ourselves across El Dorado Hills.

Deck Installation

We frame new decks with joists set 16 inches on center, doubled up under hot tubs or heavy planters. Footings go below grade to bear on solid soil, not the loose fill a lot of El Dorado Hills lots get graded with. We'll walk the site with you first and talk through height, stairs, and how the deck ties into the house before any lumber gets cut.

Deck Repair

Most repair calls start with a soft spot underfoot or a board that's cupping. We pull the bad boards, check the joists underneath for rot before we just cap over it, and match decking as close as we can if it's an older deck.

Deck Staining & Sealing

Sun on a south-facing deck in El Dorado Hills will gray untreated wood in a season. We pressure wash, let the wood dry a few days, then apply a penetrating oil-based stain rather than a film-forming one that just peels later. Two coats, worked into the end grain where boards actually take on water.

Custom Deck Design

Some lots here drop off fast from the back door, which means stairs, landings, or a deck on two levels instead of one flat rectangle. We draw it out with actual beam and post sizing before we quote it, not a sketch on a napkin.

Composite Decking Installation

Composite boards like Trex or TimberTech don't rot, but they still need proper joist spacing and hidden fasteners so they don't buckle in the heat. We run the boards with the gap the manufacturer specs, because composite expands more than wood does on a 100-degree day.

Deck Railing Repair & Installation

California code wants a 4-inch max gap between balusters and a 36-inch minimum rail height on most residential decks. We check post attachment first. Loose railings usually trace back to a post that was never through-bolted to the rim joist, not the railing itself.

Deck Resurfacing

If the frame underneath is still sound, we can strip off old decking and lay new boards without rebuilding the whole structure. It's a way to get a fresh deck surface without paying for footings and framing you don't need again.

Multi-Level Deck Construction

Split-level backyards around here often call for a deck that steps down in two or three stages instead of one long staircase. Each level needs its own beam and footing layout, so we engineer it level by level rather than treating it as one big platform.

Deck Demolition & Removal

Old decks come down board by board so we can check what's salvageable underneath, ledger flashing especially. We haul off the debris the same day, no leaving a pile of lumber in the driveway for a week.

Pergolas & Deck Covers

A pergola or a solid deck cover cuts the afternoon sun on a west-facing deck, which around El Dorado Hills in July matters more than people expect. We tie the posts into the existing deck framing or set new footings, depending on what the deck was built to handle.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across El Dorado Hills, CA

Deck installation, repair, and staining across the Sacramento foothills.

El Dorado Hills, CA
Sacramento, CA
Elk Grove, CA
Roseville, CA
Citrus Heights, CA
Folsom, CA
Rancho Cordova, CA
Rocklin, CA
Fair Oaks, CA
Cameron Park, CA
Placerville, CA
Shingle Springs, CA
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck?
Most California jurisdictions require a permit for any deck more than 30 inches above grade, and some require one regardless of height if it's attached to the house. The permit process includes a footing inspection before decking goes down and a final inspection once railings are installed.
How long does it take to build a deck?
A straightforward ground-level deck around 300 square feet typically takes one to two weeks once material is on site, including footings, framing, decking, and railings. Multi-level decks, custom stairs, or built-in features add time, and permit inspection scheduling can add a few days on either end.
Can you build a deck to fit a specific budget?
Deck size, decking material, and railing style are the three factors that move cost the most, so a budget conversation usually starts with which of those matters least to you. Pressure-treated lumber costs less upfront than composite decking, but composite skips the recurring cost of staining.
Do you guarantee your deck work?
Reputable deck builders back their labor with a workmanship warranty, typically one to a few years, separate from manufacturer warranties on lumber or composite decking, which often run 25 years against fading or staining. Ask specifically what's covered under labor warranty versus material warranty before signing.
Will I be dealing with the same person throughout the project?
On most deck projects, one person handles the estimate, the daily framing and finish work, and the final walkthrough, rather than passing the job between different crews. Direct contact with whoever's actually on site makes it easier to catch a problem, like a footing location, before it's poured.
What decking materials do you work with?
Common decking materials include pressure-treated pine, cedar, redwood, and composite brands like Trex or TimberTech, each with different maintenance and lifespan tradeoffs. Pressure-treated lumber needs restaining every two to three years, while composite decking needs occasional washing but no sealing.
Can I stay in my house during a deck build?
Deck construction happens entirely outside the home, so living in the house during the build isn't a problem, though there will be noise from saws and nail guns during work hours. Access to the yard or a side gate for material delivery should stay clear for the duration of the project.
What should I do to prepare my yard before deck construction starts?
Clearing furniture, planters, and grills off the existing deck or the build area lets the crew start framing on day one instead of losing time to setup. Marking the location of sprinkler lines or buried cable helps avoid hitting them when digging footings.
What happens if you find rot or a problem once the old deck is torn out?
Hidden rot in ledger boards, rim joists, or support posts sometimes only shows up once old decking is pulled off, and it needs to be addressed before new decking goes down regardless of the original quote. A change order covering the additional lumber and labor gets presented before that work proceeds, not after.
How do I maintain a new deck once it's finished?
Wood decks need a fresh coat of sealant or stain roughly every two to three years, more often on a south or west-facing deck that takes direct sun. Composite decking just needs periodic washing with soap and water, but keeping planters and grills from sitting directly on the boards in either case prevents staining and trapped moisture.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (916) 894-8527